Mechatronics home Send Feedback Print

Previous Topic

Next Topic

Book Contents

Book Index

Install LORC070903 tubing set 2

Note : Start to install with the tube end with label 5 which is shown GREEN in the picture.
Next picture: The installed blue tube is now BLUE, continue with the next GREEN tube.

-

LORC070902_tubing_set_1

LORC070902_tubing_set_1

  • Start with tube end with label 5.
  • Put the short tube into the pinch valve V2 in the back port.
  • Connect tube with label 5 on the connector 5.
  • Put the other short tube into the pinch valve V2 at the front port.
  • Connect tube with label 6 on the connector 6.

LORC070902_tubing_set_1

LORC070902_tubing_set_1

  • Take the long end of the tube and run this through the back hole
  •  
  • Take now the connection tube and put the short tube in V1 through the back port.
  • Connect the tube with label 4 onto connector 4

LORC070902_tubing_set_1

 

  • Take the long end of the tube and run this through the front hole

 

Tubing to waste connector

LORC070902_tubing_set_1

LORC070902_tubing_set_1

  • Connect tube with label 7 on the connector 7
  • Connect tube labeled with waste to the waste bottle

See Also

Tubing replacements

Gradient pump tube replacement

Install LORC070901 tubing

Install LORC070902 tubing set 1

Install LORC070904 tubing set 3

After replacement of all tubing

To top of page Mechatronics home Send Feedback Print