CAUTION: Never turn off the main switch when the instrument is running. Always wait until the instrument has completed its cycle.
General operation procedure
Powering up
Preparations
Performing Osmoscan
Performing Deformability curve test
Performing Cell stability test
Performing Cell membrane stability test
Performing RBC Aggregation test
End of day wash
Decontamination procedures Routine
Waste container disposal