Mechatronics home Send Feedback Print

Previous Topic

Next Topic

Book Contents

Book Index

Powering down

CAUTION: Never turn off the main switch when the instrument is running. Always wait until the instrument has completed its cycle.

  • Go to Hardware check ->LoRRca IO
  • Press <Rinse cup>.
  • Press <Rinse gradient pump>.(If available)
  • Dry CUP and BOB. Do not scratch the CUP!
  • Exit software.
  • End of day wash (see further in this chapter)
  • Switch OFF the LoRRca.
  • Switch OFF the PC and printer.
  • Empty the waste bottle.

hwc

See Also

General operation procedure

Powering up

Preparations

Performing Osmoscan

Performing Deformability curve test

Performing Cell stability test

Performing Cell membrane stability test

Performing RBC Aggregation test

End of day wash

Decontamination procedures Routine

Waste container disposal

To top of page Mechatronics home Send Feedback Print