Install LORC070903 tubing set 2
Note: Start to install with the tube end with label 5 which is shown GREEN in the picture. Next picture: The installed blue tube is now BLUE, continue with the next GREEN tube.
-
![LORC070902_tubing_set_1](lorc070903_tubing_set_1.gif)
|
![LORC070902_tubing_set_1](lorc070903_tubing_set_2.gif)
|
Start with tube end with label 5.
1. Put the short tube into the pinch valve V2 in the back port.
2. Connect tube with "5" on the connector 5.
|
3. Put the other short tube into the pinch valve V2 at the front port.
4. Connect tube with label 6 on the connector 6.
|
![LORC070902_tubing_set_1](lorc070903_tubing_set_3.gif)
|
![LORC070902_tubing_set_1](lorc070903_tubing_set_4.gif)
|
5. Take the long end of the tube and run this through the back hole
|
6. Take connection tube and put the short tube in V1 through the back port.
7. Connect the tube with label 4 to connector 4
|
![LORC070902_tubing_set_1](lorc070903_tubing_set_5.gif)
|
![LORC070902_tubing_set_1](lorc070903_tubing_set_6.gif)
|
8. Take the long end of the tube and run this through the front hole
|
9. Connect tube "4" on the bob, connect tube "6" on the EC-sensor
|
Tubing to waste connector
![LORC070902_tubing_set_1](lorc070904_tubing_set_1.gif)
|
![LORC070902_tubing_set_1](lorc070904_tubing_set_2.gif)
|
- Connect tube with label 7 on the connector 7
|
- Connect tube labelled with waste to the waste bottle
|
![LORC040901](lorc070903.gif)
|