First Start-up
Steady state
After switching on, the LoRRca MaxSis needs 5 minutes to warm up.
Before the instrument can be operated, you have to carry out the following checks and procedures:
- Check that there are no foreign objects (tools, for example) in the instrument.
- Switch the instrument.
- Start-up the PC.
- Choose LoRRca software program.
- Select <>.
- Move the Bob down.
|
|
- Choose <>
- Set camera gain at 250.
- Close the hood.
|
|
- Check the image:
- OK: The instrument is now ready.
|
|
- Not OK: Misaligned
- Check position of the projection screen.
|
|
|
|
- For basic version choose <><>.
The tubes are being filled.
- Dry BOB and CUP. Do not scratch the cup!
- For Osmoscan version choose <><>.
The tubes are being filled.
- Dry BOB and CUP. Do not scratch the cup!
|
|
Alignment of the projection screen:
- Use the hexagon key 2mm to loosen the projection screen holder.
|
|
- Align the projection screen until the black dot on the screen is aligned with the laser spot.
- Tighten the screws of the projection screen holder.
|
|
After this procedure, the instrument is in the start position.
|