Manual home Send Feedback Print

Previous Topic

Next Topic

Book Contents

Book Index

Power up sequence

  • Check all units for unblocked passageways. Racks may only be present on the pool’s stainless steel storage areas.
  • Start sequence
    • Switch ON the ESR analyzer unit.
    • Switch ON the PC and the monitor.
    • Wait until "Windows" is ready for use.
    • Start the Interrliner software.
    • Observe the Robotic arm movement during the start-up, after finishing the reset sequence, the ESR analyzer unit is ready for use.
    • Switch ON the Interrliner. The system becomes operational when the lines "HST Version X.XX" and "Lab Comm On (or OFF)" are shown in the display.
    • If applicable : switch ON the printer. The printer prints the paper header automatically.
    • The Interrliner is ready for use.

See Also

Quick start-up

Check list

Start-pool

End-pool

ESR Unit check

Priming the fluid system

To top of page Mechatronics home Send Feedback Print