Manual home Send Feedback Print

Previous Topic

Next Topic

Book Contents

Book Index

Start-pool

Ensure that racks are correctly placed in the Start-Pool; the groove on the side of the rack must catch the strip at the right side of the storage area.

Note: Do not push racks manually against or away from the front end, as this will interfere with the ejector mechanism.

See Also

Quick start-up

Check list

End-pool

Power up sequence

ESR Unit check

Priming the fluid system

To top of page Mechatronics home Send Feedback Print