Appendix - Maintenance schedule
Maintenance performed periodically or after number of samples
Maintenance schedule Starrsed ST
|
Sample volume: 100 per day (5 working days)
|
Daily
|
Once a week
|
Level 4 (monthly)
|
Level 3 (quarterly)
|
Level 2 (halfyearly)
|
Level 1 (yearly)
|
Parts
|
Total amount / year
|
or earlier after number of samples:
|
|
|
2.000 samples
|
6.000 samples
|
12.000 samples
|
24.000 samples
|
Clean outside of the aspiration needle
|
X
|
X
|
X
|
X
|
X
|
X
|
|
|
End-of day-wash procedure / Wash all pipettes
|
X
|
X
|
X
|
X
|
X
|
X
|
|
|
Check blood sensor 110-160
|
|
X
|
X
|
X
|
X
|
X
|
|
|
Measure sensor 40-60 (air value)
|
|
X
|
X
|
X
|
X
|
X
|
|
|
Inspect sample needle condition
|
|
X
|
X
|
X
|
X
|
X
|
|
|
Clean fill nozzle
|
|
X
|
X
|
X
|
X
|
X
|
|
|
Check waste tube condition
|
|
|
X
|
X
|
X
|
X
|
|
|
Replace nozzle O-ring and pipette sealing ring
|
|
|
X
|
X
|
X
|
X
|
QWLV050016/ BANG030052
|
12/12
|
Replace needle sealing block (double needle version)
|
|
|
|
X
|
X
|
X
|
BANG049002
|
4
|
Replace O-rings needle block (single needle version)
|
|
|
|
X
|
X
|
x
|
QWLV050080
|
2
|
Replace disk filter
|
|
|
|
X
|
X
|
X
|
QWLV040001
|
4
|
Replace waste pump tube
|
|
|
|
|
X
|
X
|
QWLV090011
|
2
|
Replace plunger tips (if needed)
|
|
|
|
|
|
X
|
BANG020003
|
24
|
Replace needle assembly (double needle version)
|
|
|
|
|
|
X
|
BANG049001
|
1
|
Replace needle (single needle version)
|
|
|
|
|
|
X
|
BANG040050
|
1
|
Replace all tubing (with tubing set)
|
|
|
|
|
|
X
|
BANG079200
|
1
|
Replace teflon tips (repair set Diluter syringe)*
|
|
|
|
|
|
X
|
QWLV030901
|
1
|
Replace quad ring diluter
|
|
|
|
|
|
X
|
QWLV080002
|
1
|
Replace O-rings fill nozzle
|
|
|
|
|
|
X
|
QWLV050003
|
5
|
*Only applicable for Diluter syringe QWLV030009, Diluter syringe QWLV030021 has to be replaced after 2 years
|