Manual home Send Feedback Print

Appendix - Maintenance schedule

Maintenance performed periodically or after number of samples

Maintenance Schedule Interrliner (Example)

Sample volume: 350 per day (5 working days)

Daily

Weekly

Level 4 (monthly)

Level 3 (quarterly)

Level 2 (halfyearly)

Level 1 (yearly)

Parts

Total amount/year

or earlier after number of samples

 

 

7.500 samples

23.000 samples

46.000 samples

91.000 samples

 

Per 91.000 samples

Perform End-of-day wash

X

X

X

X

X

X

 

 

Clean outside aspiration needle

X

X

X

X

X

X

 

 

Check tubing/diluent syringe

X

X

X

X

X

X

 

 

Clean outside instrument

X

X

X

X

X

X

 

 

Clean Fill nozzle

 

X

X

X

X

X

 

 

Clean waste separator

 

X

X

X

X

X

 

 

Check sensors

 

X

X

X

X

X

 

 

Replace Fill nozzle O-ring

 

 

X

X

X

X

QWLV050004

12

Replace bacterial air filter (HEPA)

 

 

X

X

X

X

QWLV040002

12

Replace Disc filter (white) Only if internal waste container is used

 

 

X

X

X

X

QWLV040001

12

Replace Rinse tube assembly

 

 

X

X

X

X

ESRI090902

12

Replace Saline tube assembly

 

 

X

X

X

X

ESRI090903

12

Run Fill and clean

 

 

X

X

X

X

 

 

Replace Waste cassette assembly

 

 

 

X

X

X

ESRI090921

4

Replace Blotting washer waste pump

 

 

 

X

X

X

ESRI090026

4

Replace Pinch valve tube

 

 

 

X

X

X

ESRI010246

4

Replace Blue disc filter

 

 

 

X

X

X

QWLV040003

4

Check needle condition

 

 

 

 

X

X

 

 

Replace teflon tips (diluter syringe repair set)*

 

 

 

 

X

X

QWLV030901

2

Replace Waste pump motor

 

 

 

 

 

X

ESRI090920

1

Replace Fill block washer

 

 

 

 

 

X

ESRI030906

1

Replace Sample probe assembly

 

 

 

 

 

X

ESRI050909

1

Replace Pipette valves bodies (84 pieces)

 

 

 

 

 

X

QTST040001

84

Replace Outer needle assembly

 

 

 

 

 

X

ESRI050950

1

Replace all tubing (with Tubing set)

 

 

 

 

 

X

EHST079200

1

Compression spring outer needle

 

 

 

 

 

X

EHST050053

1

Needle cable assembly

 

 

 

 

 

X

EHST089056

1

*Only applicable for Diluter syringe QWLV030009, Diluter syringe QWLV030021 has to be replaced after 2 years

Note:

Periodical Maintenance Kit SEHST110985, containing all parts for yearly maintenance

Two years Periodical Maintenance Kit: SESRI120906

ESRI070923

Fill tube assembly to regulator

ESRI070924

Fill tube assembly from regulator

QWLV030021

Diluter Syringe

QWLV080002

Quad Ring

To top of page Mechatronics home Send Feedback Print